Powering Rural America's
Energy Future
Bednorz Energy LLC develops utility-scale solar projects on agricultural land, demonstrating that rural communities can achieve energy independence while preserving their farming heritage.
Rural Energy Independence, Redefined
Bednorz Energy LLC was founded in 2025 with a clear mission: prove that rural agricultural communities can lead America's clean energy transition—without sacrificing the land that defines them.
Headquartered in Hermitage, Tennessee, and operating in Box Elder County, Utah, we specialize in agrivoltaics—the co-location of solar energy systems with active agricultural operations. This dual land-use model generates clean electricity while supporting the local farming economy.
Our approach combines rigorous technical planning, deep knowledge of federal funding programs including USDA REAP grants, and genuine commitment to rural community partnership. We don't just build solar projects—we build lasting relationships with the communities we serve.
As a legally formed Utah LLC with a federal Employer Identification Number, we operate with full transparency and regulatory compliance at every stage of development.
Company Details
- EntityUtah LLC
- Entity #14600001-0160
- Federal EIN39-3750653
- FoundedAugust 9, 2025
- HQHermitage, TN
- Project SiteBox Elder Co., UT
Leadership
Renewable energy entrepreneur with expertise in rural project development, USDA funding strategy, and utility interconnection.
Comprehensive Renewable Energy Services
From site assessment to long-term operations, we manage every facet of utility-scale solar development for rural communities and agricultural landowners.
Solar Project Development
End-to-end development of utility-scale solar PV systems, from feasibility analysis through construction management and commercial operation.
- Site assessment & feasibility analysis
- Permitting & regulatory compliance
- EPC contractor selection & management
- Power Purchase Agreement negotiation
Agrivoltaics Consulting
Expert guidance on dual land-use strategies that co-locate solar generation with agricultural activities, maximizing both energy output and farm productivity.
- Dual land-use planning & design
- Agricultural impact assessment
- Panel height & spacing optimization
- Crop & grazing compatibility analysis
Grid Interconnection Management
Comprehensive support through the utility interconnection process, including technical documentation, application preparation, and utility liaison services.
- Level 1 & Level 2 application preparation
- One-line diagram & site plan development
- Rocky Mountain Power coordination
- IEEE 1547-2018 compliance verification
Federal Grant & Funding Strategy
Specialized expertise in USDA Rural Energy for America Program (REAP) grants, federal tax incentives, and rural development funding sources.
- USDA REAP grant preparation (up to $1.25M)
- 30% Investment Tax Credit optimization
- Rural development funding sourcing
- Financial modeling & ROI analysis
Community Partnership Development
Building lasting relationships with rural communities, county governments, and agricultural stakeholders to ensure projects deliver lasting local benefit.
- Local stakeholder engagement
- Economic impact modeling
- County government coordination
- Community benefit agreement support
Operations & Maintenance
Long-term system performance management keeping solar installations operating at peak efficiency throughout their 25-year operational lifecycle.
- Performance monitoring & reporting
- Preventive maintenance programs
- Equipment warranty coordination
- Revenue optimization services
2MW Solar Development — Box Elder County, Utah
Phase 1 of a transformative 15MW rural energy initiative, demonstrating how agricultural communities can lead America's clean energy transition.
Project Overview
Our flagship 2MW solar photovoltaic system in Box Elder County, Utah sits on 40 acres of agricultural land—8 acres utilized for the Phase 1 installation. The site (SE/4 SW/4 SEC 33 T08N R15W, SLM; Parcel #020170057) benefits from exceptional solar resources averaging 4.5–5.5 kWh/m²/day.
The project features single-axis solar tracking technology with crystalline silicon panels and dual 1MW central inverters certified to UL 1741 SB and IEEE 1547-2018 standards. Interconnection with Rocky Mountain Power's grid is underway via the Utah Level 2 Interconnection Application process.
Financial Snapshot
Technical Specifications
- System Capacity 2,000 kW DC
- Technology Crystalline Silicon PV
- Tracking Single-Axis Tracking
- Inverters 2 × 1MW Central
- Compliance UL 1741 SB / IEEE 1547-2018
- Grid Connection Rocky Mountain Power
- Site Area 8 Acres (Phase 1)
- Solar Resource 4.5–5.5 kWh/m²/day
Development Timeline
-
Utah LLC Formation August 9, 2025
-
Site Identification & Survey Box Elder County, UT — 40 Acres
-
Interconnection Application Filed Rocky Mountain Power — Level 2
-
USDA REAP Application In Preparation — Up to $1.25M
-
EPC Contractor Selection Planned Q2 2026
-
Construction & Commissioning Planned Q4 2026
-
Phase 2 Expansion (6MW) Planned 2027
15MW Expansion Roadmap
A Development Partner Built for Rural Success
We combine technical excellence, federal funding expertise, and deep commitment to rural communities—making us uniquely positioned to deliver successful projects.
Proven Federal Funding Expertise
Deep experience with USDA REAP grants, USDA Rural Development programs, and the 30% Federal Investment Tax Credit—funding sources that can cover up to 75% of project costs.
Connected to Rural Communities
We prioritize economic development for the communities hosting our projects—local hiring, agricultural preservation, and transparent stakeholder engagement are built into every project.
Technical Rigor at Every Stage
From IEEE 1547-2018 compliant inverter selection to fully prepared Level 2 interconnection applications, our technical documentation meets utility and regulatory standards first time.
Legally Structured & Transparent
Bednorz Energy LLC is a properly formed Utah LLC with an active Federal EIN, operating with full regulatory compliance. We maintain complete financial transparency with all partners and funders.
Scalable & Replicable Model
The 15MW phased development framework we've built for Box Elder County is designed to be replicated across rural communities throughout the Mountain West—creating a scalable platform for rural energy investment.
Attractive Investment Profile
With 8–12% annual ROI over a 25-year lifespan, combined with federal grant funding that can offset up to 75% of project costs, our projects offer stable, government-backed returns for impact investors.
A Legitimate, Verified Business
Bednorz Energy LLC is fully registered, tax-compliant, and operationally active.
Utah LLC
Registered with the Utah Division of Corporations & Commercial Code.
Federal EIN
IRS-issued Employer Identification Number for federal tax compliance.
USDA SAM Registration
Registered in the System for Award Management for federal grant eligibility.
Interconnection Filed
Utah Level 2 Interconnection Application submitted to Rocky Mountain Power.
Site Survey Complete
Professional land survey completed for Box Elder County project site.
REAP Eligible
Qualified for USDA Rural Energy for America Program — up to $1.25M available.
Partner With Bednorz Energy
Whether you're a landowner, investor, government partner, or community stakeholder— we'd love to hear from you. Fill out the form below and we'll be in touch within one business day.